The stalling of Chandrayaan-2 on Monday due to a leak in the cryogenic engine of GSLV-MkIII has put a question mark over Indian Space Research Organisation’s future missions, including Gaganyaan. The manned mission slated for 2022 and missions to Sun (2020) and Venus (2023) are all dependent on the same rocket which now needs to be fixed.
from Times of India https://ift.tt/30FJhG9
Post Top Ad
Monday, July 15, 2019
Isro’s 'Bahubali' casts shadow on manned mission
Tags
# Times of India
Share This
About মুক্তি এন. জি. ও
Times of India
Labels:
Times of India
Subscribe to:
Post Comments (Atom)
Post Bottom Ad
Responsive Ads Here
Author Details
Templatesyard is a blogger resources site is a provider of high quality blogger template with premium looking layout and robust design. The main mission of templatesyard is to provide the best quality blogger templates which are professionally designed and perfectlly seo optimized to deliver best result for your blog.
No comments:
Post a Comment